Optimal Stormwater design and construction projects deliver quality solutions for reliable performance, safe and practical operation and maintenance and balanced operating cost.  Optimal design, construct and operate under third party quality assured Integrated Management System (IMS) Standards AS/NZS ISO 9001:2016 & AS/NZS ISO 14001:2016 & AS/NZS 4801:2001

We prepare comprehensive construction methodologies, shoring design, pipeline and hydraulic specification, utility protect plans, flow management plans, pedestrian and traffic safe work methods statement, site induction, environmental management plans and community consultation are standard features of our construction projects.

Brimbank Council – Design & Construction of an Ocean Save OS2318 GPT

Optimal Stormwater completed the installation of one of OceanSave’s largest Gross Pollutant Traps at Station Water Reserve, which drains to Kororoit Creek in Deer Park. During the excavation, Optimal removed some rocks and boulders which were repurposed as features rock for […]

view project details

Inner West Council – Design and Construction of Ocean Save OS1112

Scope of works included the design and installation of an Ocean Save for the Inner West Council. The site was located within the Council depot, the Council required a design to reduce their impacts on the downstream environment. The project […]

view project details

Lane Cove Council – Design and Construction of a CDS Unit

Lane Cove Council awarded Optimal the design and construction of a CDS 1512 Unit after successfully constructing the previous GPT.  The Scope of Work included: design, supply and construction of a CDS Unit, diversion chamber and site reinstatement.  At completion […]

view project details

MidCoast Council – Design and Construction of CDS P1512

Optimal Stormwater completed the design and construction of a CDS P1512 for MidCoast Council at Little Street, Forster. The design was off the back of an audit completed by Optimal in 2019, where a dilapidated Ecosol was recommended for re-design. […]

view project details

Civic Park Construction, Pendle Hill Wetland Improvement Project incl D&C of 28.5m Trashrack and 2 x CDS Units (P1518 and P1012).

Optimal Stormwater was engaged for the design and construction of SQID’s to accompany the Cumberland Council Civic Park Masterplan, a $4M project bringing Civic Park to life including the wetland improvement works. Optimal proposed the construction of 28.5m of graduated […]

view project details

Sutherland Shire Council – Carina Creek tidal channel restoration, Como

Optimal Stormwater won the construction of the restoration of the tidal channel in Carina Bay Reserve, Como. Carina Creek had suffered from sediment deposition which accumulated at the tidal confluence and subsequently created a barrier above the tidal level, mangroves […]

view project details

Willoughby City Council – Warners Park creek restoration, rock infiltration dam, GPT and stormwater harvesting pumpwell

Optimal Stormwater were engaged by Willoughby Council to undertake the design and construction of creek restoration, rock infiltration dam, a GPT and stormwater harvesting pumpwell at Warners Park, Northbridge. Optimal Stormwater designed and documented the works, including design of a […]

view project details

Lane Cove Council – Lane Cove Bushland Park Waterway Stabilisation

Optimal Stormwater were engaged by Lane Cove Council to undertake the construction of waterway at Lane Cove Bushland Park. The project involves protecting two existing gullys from erosion to prevent damage to an endangered ecological fungi community, protecting an existing […]

view project details

Mosman Municipal Council – Balmoral Beach Channel Improvement Works

In 2020 Optimal Stormwater was commissioned by Mosman Municipal Council to design improvements to the watercourse discharging to popular Balmoral Beach. The watercourse was subject to severe erosion and sediment deposition as a consequence of urban stormwater flows. The headwall […]

view project details

Sutherland Shire Council – Design and Construction of two CDS Units

In 2019 Optimal Stormwater won the tender to design and construct two GPTs for Gwawley Bay catchment. One was a CDS P2018 Unit at Kareena Road, Miranda and the other a CDS P3024 Unit at the Five Ways intersection. The […]

view project details

Dubbo Regional Council – Paringa Place Wellington – Design and Construction of GPT – Ocean Save OS1515

In 2020 Optimal Stormwater won the tender to design and construct three (3) GPTs for Dubbo Regional Council. Total tender value for design and construction of the three GPTs – just over $1.1M. The third site was at Paringa Place, […]

view project details

Dubbo Regional Council – Brisbane Street, Dubbo (Devils Hole Reserve) – Design and Construction of GPT – DSTORM GPT

In 2020 Optimal Stormwater won the tender to design and construct three (3) GPTs for Dubbo Regional Council. Total tender value for design and construction of the three GPTs – just over $1.1M. The second site was at Devils Hole […]

view project details

Lane Cove Council – Stringybark Reserve CDS Unit Design and Construction

In February 2020 Optimal Stormwater won the tender to design and construct a CDS Unit P2018 for Stringybark Reserve. As an alternative, Council was given the opportunity to design and construct an equivalent SPEL Vortceptor, also a high performance vortex […]

view project details

Dubbo Regional Council – Whylandra Street, West Dubbo – Design and Construction of GPT – Twin CDS 3030 with double depth sumps

In 2020 Optimal Stormwater won the tender to design and construct three (3) GPTs for Dubbo Regional Council. The most important site is located on Whylandra Street, West Dubbo with a 300 hectare catchment on twin 1800mm pipes discharging to […]

view project details

North Sydney – Hayes Street GPT, Neutral Bay

In 2019 Optimal Stormwater won the detailed design of six Gross Pollutant Traps at various locations around North Sydney LGA. Optimal subsequently won the construction of a CDS 2018 at Hayes St, the first of six Gross Pollutant Trap. The […]

view project details

Canterbury Bankstown Council Montgomery Avenue Graduated Trashrack

Canterbury Bankstown Council has been a leader in the management of stormwater and operate over 70 GPTs and other devices. Older technologies installed decades ago are being upgraded and over 2018- 2019 Optimal Stormwater assisted with the design and construction […]

view project details

Sutherland Shire Council – Kareena Road and Five Ways GPT

Gwawley Bay is the focal point for water quality improvement with heavy loads of pollution discharged in to the bay via stormwater. Through a detailed investigation Kareena Road in Caringbah and  Fiveways intersection in Miranda were identified by Optimal Stormwater […]

view project details

Design and Construct 5 Gross Pollution Traps and Graduated Trashracks

Tuggerah Lakes on the Central Coast have been the focal point for funding by federal, state and local government due to their significant environmental value.  The central coast community is also very zealous about the lakes and coastal environment.    […]

view project details

2018 – 2019 Veolia Banksmeadow Waste Transfer Terminal (BTT) Audit, Design and Construction

Veolia Waste and Environmental Services operate under a strict EPA license requiring stormwater contaminated with leachate from operations to meet high standards prior to discharge. Modification of an existing stormwater detention basin was identified as an opportunity to more consistently […]

view project details

Inner West Council Blackmore Oval Wetland Renovation

Inner West Council identified a redundant RMS sediment basin as an opportunity to repurpose into a community and environmental asset.  Integrating sustainable water practice and environmental engineering Optimal Stormwater delivered a comprehensive redesign and construction project for IWC.  Featuring integrated […]

view project details

Sutherland Shire Council – Creek and Drainage works, Towra Point Nature Reserve

Optimal Stormwater undertook the design and construction of the creek and drainage works at Towra Point Nature Reserve including the rehabilitation and re-vegetation of an overland flow drainage channel and a new pit to manage flooding and erosion. We used […]

view project details

Hornsby Shire Council – Design and Construct CDS P1518 Unit 1/4 GPT Projects

Optimal Stormwater was selected by Hornsby Shire Council to design and construct a new stormwater treatment solution upstream of a bioretention basin in Lyne Road Reserve, Cheltenham. Council identified that the existing, underperforming bioretention basin downstream was underperforming due to […]

view project details

Hornsby Shire Council – Design and Construct CDS P1518 Unit with DD Sump 2/4 GPT Projects

Optimal Stormwater was selected by Hornsby Shire Council to design and construct a new stormwater treatment solution upstream of an ecologically sensitive creek within Neal Reserve, Sherbrook Road, Hornsby. The existing basket-type GPT was well undersized and causing upstream flooding […]

view project details

Hornsby Shire Council – Design and Construct Vortcapture VC60 unit 3/4 GPT Projects

Optimal Stormwater was selected by Hornsby Shire Council to design and construct a new stormwater treatment solution upstream of a sensitive waterway in an industrial park on Salisbury Road, Hornsby Heights. Due to the relatively small catchment, extreme depth and […]

view project details

Hornsby Shire Council – Design and Construct CDS P1009 Unit 4/4 GPT Projects

Optimal Stormwater was selected by Hornsby Shire Council to design and construct a new stormwater treatment solution upstream of an ecologically sensitive creek at Pike Road, Hornsby Heights. The existing Humegard GPT was severely underperforming, and Optimal Stormwater was able […]