GPT Installation for another CDS unit at Kensington Pond for Centennial Park
Based on the success of the previous works, Optimal Stormwater was once again selected to do the GPT installation for their next pond pretreatment.
And once again the design was completely useless, full of error and oversights, and Optimal Stormwater once again had to redesign it.
The project had some massive problems with unidentified services and incredibly hard groundwater conditions, but in the end Optimal Stormwater prevailed and the device is working brilliantly.
The caisson CDS unit included pits, pipes, a rock plinth and headwall, “fail open†child exclusion /wp-content/uploads/original/