Civic Park Construction, Pendle Hill Wetland Improvement Project incl D&C of 28.5m Trashrack and 2 x CDS Units (P1518 and P1012).

Optimal Stormwater was engaged for the design and construction of SQID’s to accompany the Cumberland Council Civic Park Masterplan, a $4M project bringing Civic Park to life including the wetland improvement works. Optimal proposed the construction of 28.5m of graduated trash rack, along with a P1012 and a P1518 CDS units as gross pollutant traps for the site. The design ensured that all catchments draining through the site were adequately treated by robust and easily maintained high performing assets. The devices are anticipated to collect over 350 tonnes of pollution per year.