Projects

Centennial Parklands Trust – Musgrave Pond

Centennial Parklands Trust were having issues with Musgrave Pond and engaged Optimal Stormwater for the design and construction of rectification works on Musgrave Pond which involved penstock works, new grated letterbox lid and new maintenance fence. These works have enabled Musgrave Pond to be lowered so that the upstream GPT can be physically cleaned and enables CPT to have control over the water level as well as enabling more storm flows to pass through the drainage control structure.